Maintenance for TPS-C1 |
2024-11-14 |
Tip seals changed. |
|
|
Deepak Vyas |
Maintenance for M9A |
2024-10-09 |
Hole #2 in the Ceramic of Sep#2+ |
|
|
Bassam Hitti |
Maintenance for CMP-06 |
2024-06-13 |
Adsorber changed. |
|
|
Deepak Vyas |
Maintenance for CMP-07 |
2024-06-13 |
Adsorber changed. |
|
|
Deepak Vyas |
Maintenance for CMP13 |
2024-06-13 |
Adsorber changed with a CTI adsorber. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2024-04-16 |
During shutdown high pressure reading on the condenser gauge |
|
|
Bassam Hitti |
Maintenance for OLP-18 |
2024-04-05 |
Minor Kit |
|
|
Rahim Abasalti |
Maintenance for M9A |
2024-01-08 |
Replacement of Arc Flashed damaged Ceramic on S2+ and Added Aluminium Corona Shield |
|
|
Rahim Abasalti |
Maintenance for DRP-03 |
2023-12-06 |
Factory refurbished pump head installed. |
|
|
Deepak Vyas |
Maintenance for DRP-35 |
2023-11-30 |
Pump module exchanged for a factory rebuilt one. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2023-11-22 |
Penning gauge reading too high!-Clean oil for Diff Pump |
|
|
Bassam Hitti |
Maintenance for M15 |
2023-11-14 |
Replacement S1DP1 Separator diffusion pumps heater . |
, , , , |
|
Rahim Abasalti |
Maintenance for OLP-04 |
2023-10-14 |
Oil changed on this pump installed on the leak detector. |
|
|
Deepak Vyas |
Maintenance for OLP-09 |
2023-10-14 |
Oil changed on pump which is typically used on the vacuum oven in the mezzanine. |
|
|
Deepak Vyas |
Maintenance for DRP-35 |
2023-09-25 |
Pump module exchanged for a factory rebuilt one. |
|
|
Deepak Vyas |
Maintenance for BNQR Cryostat |
2023-07-19 |
Modification on "Second Version" of Al Heat Shield Flange |
|
|
Rahim Abasalti |
Maintenance for BNQR Cryostat |
2023-07-19 |
Thermometers Replacement |
|
|
Rahim Abasalti |
Maintenance for BNQR Cryostat |
2023-06-13 |
He leak into UHV |
|
|
Gerald Morris |
Maintenance for M9A |
2023-06-06 |
SO2 Purity in Separators SF6 Volumes |
|
|
Rahim Abasalti |
Maintenance for SF6 Aciditor |
2023-05-31 |
SO2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for M20 Upstream |
2023-05-22 |
M20 IG controllers' cards repaired |
|
|
Gerald Morris |
Maintenance for M20 Upstream |
2023-05-08 |
Ion gauge filaments and Window materials changed. |
|
|
Deepak Vyas |
Maintenance for M9A |
2023-03-29 |
Separator 1- Ion Gauge Addition |
|
|
Rahim Abasalti |
Maintenance for M9A |
2023-03-23 |
Separator 2- Addition & Replacement Ion Gauges |
, |
|
Rahim Abasalti |
Maintenance for OMF-04 |
2023-03-20 |
Replaces with OMF-06 |
|
|
Rahim Abasalti |
Maintenance for M15 |
2023-03-10 |
Separator 1 Positive and Negative Feedthrough Replacement |
|
|
Darren Blom |
Maintenance for M20 Upstream |
2023-03-06 |
Log of recent maintenance on M20. |
|
|
Gerald Morris |
Maintenance for M20 Upstream |
2023-03-06 |
M20 turbo pumps. |
|
|
Gerald Morris |
Maintenance for ISAC-1 BNMR |
2023-02-24 |
All scroll pumps tested to determine base pressure, state of wear. |
, |
|
Gerald Morris |
Maintenance for M20 Upstream |
2023-02-23 |
SF6 gas cylinder changed. |
|
|
Gerald Morris |
Maintenance for M20 Upstream |
2023-02-17 |
Leak observed and diagnosed and remedied. |
, , , , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2023-02-17 |
Leak into OVC, short internal z-coil and leaky Auto V12 |
, , , , , , , |
|
Bassam Hitti |
Maintenance for ISAC-1 BNMR |
2023-02-17 |
beta-NMR isolation transformer leaky input feedthrough is repaired |
|
|
Gerald Morris |
Maintenance for ISAC-I BNQR |
2022-09-23 |
TP ILE2A1:TP1 failed & replaced |
|
|
Gerald Morris |
Maintenance for DRP-23 |
2022-06-09 |
Pump module changed. |
|
|
Deepak Vyas |
Maintenance for DRP-02 |
2022-06-09 |
Pump module changed. |
|
|
Deepak Vyas |
Maintenance for DRP-50 |
2022-04-28 |
Tip seals changed. |
|
|
Deepak Vyas |
Maintenance for DRP-50 |
2022-04-28 |
Tip seals changed. |
|
|
Deepak Vyas |
Maintenance for DRP-50 |
2022-04-27 |
Tip seals changed. |
|
|
Deepak Vyas |
Maintenance for DRP-19 |
2022-04-27 |
VPI replaced. |
|
|
Deepak Vyas |
Maintenance for DRP-18 |
2022-04-27 |
VPI Solenoid changed. |
|
|
Deepak Vyas |
Maintenance for DRP-41 |
2022-04-27 |
VPI Solenoid changed. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2022-03-03 |
Leak in GHS |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-02-18 |
Adjust the mixture pressure and He3/He4 ratio |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2022-01-21 |
Replacement and Maintenance of 1Kpot and Diff Pump Valves |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-01-19 |
Installation of Automated Flow Controller valve |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-01-17 |
Installation: New SS Tubing for GHS, Minature Gate valve |
|
|
Rahim Abasalti |
Maintenance for M15 |
2021-11-09 |
Replace Bad O-Ring on Separator 1 Upstream Window Valve |
|
|
Darren Blom |
Maintenance for DRP-50 |
2021-10-28 |
Removed from service. |
|
|
Deepak Vyas |
Maintenance for DRP-20 |
2021-10-28 |
VPI valve failure |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2021-10-28 |
Gauge cleaned |
|
|
Deepak Vyas |
Maintenance for CRP-13 |
2021-10-28 |
Puff of air. |
|
|
Deepak Vyas |
Maintenance for CRP-06 |
2021-10-28 |
Taken out of service |
|
|
Deepak Vyas |
Maintenance for CRP-02 |
2021-10-28 |
Rebuild |
|
|
Deepak Vyas |
Maintenance for DRP-35 |
2021-10-19 |
Tip Seals changed |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2021-10-19 |
Tip Seals changed |
|
|
Deepak Vyas |
Maintenance for M15 |
2021-10-19 |
Replaced Sep. 2 Ion Gauge |
, |
|
Darren Blom |
Maintenance for CRP-04 |
2021-10-12 |
Rebuild and motor change. |
|
|
Deepak Vyas |
Maintenance for CRP-07 |
2021-10-12 |
Rebuild, motor change and crankshaft and eccentric changed. |
|
|
Deepak Vyas |
Maintenance for CRP-11 |
2021-10-12 |
Rebuilt cold head, New arrays. |
|
|
Deepak Vyas |
Maintenance for DRP-05 |
2021-08-17 |
Factory full rebuild. |
|
|
Deepak Vyas |
Maintenance for TPS-C3 |
2021-08-17 |
Gauge cleaned |
|
|
Deepak Vyas |
Maintenance for TPS-C5 |
2021-08-17 |
Gauge cleaned and Tipseals changed |
|
|
Deepak Vyas |
Maintenance for Horizontal Gas Flow Cryostat 2 |
2021-08-16 |
Leaky Window Replacement |
, , , , , , , , , |
|
Rahim Abasalti |
Maintenance for TPS-C2 |
2021-08-16 |
Gauge cleaned and Tipseals changed |
|
|
Deepak Vyas |
Maintenance for DRP-38 |
2021-07-08 |
Scroll surface failure. |
|
|
Deepak Vyas |
Maintenance for M15 |
2021-04-20 |
S1DP1 Separator diffusion pumps heater refreshed. |
|
|
Deepak Vyas |
Maintenance for M15 |
2021-04-14 |
S2DP1 Separator diff pump heater checked. |
|
|
Deepak Vyas |
Maintenance for M15 |
2021-03-29 |
All three window valves membranes changed. |
|
|
Deepak Vyas |
Maintenance for M20C |
2021-03-19 |
Separator windows changed. |
|
|
Deepak Vyas |
Maintenance for CPC-10 |
2021-03-16 |
Adsorber Changed |
|
|
Deepak Vyas |
Maintenance for CMP-04 |
2021-03-16 |
Adsorber Changed |
|
|
Deepak Vyas |
Maintenance for Cobra-01 |
2021-03-12 |
CSA Certification |
|
|
Rahim Abasalti |
Maintenance for DRP-06 |
2021-03-12 |
Decommissioned and disposed. |
|
|
Deepak Vyas |
Maintenance for M15 |
2021-03-05 |
Fix the Argon flow Piezo-electric valve (Separator 1). |
|
|
Bassam Hitti |
Maintenance for CRP-10 |
2020-11-19 |
Rebuild |
|
|
Deepak Vyas |
Maintenance for M9A |
2020-10-26 |
Replacing pressure switch for S2, Negative on Stack Volume |
|
|
Rahim Abasalti |
Maintenance for Gas Flow Cryostat (Miss Piggy) |
2020-01-30 |
Replace the temperature sensor on the window heater and Needle Valve O-rings. |
, |
|
Bassam Hitti |
Maintenance for TPS-C4 |
2019-12-24 |
Tip seal reset 6492 hrs. |
|
|
Deepak Vyas |
Maintenance for TPS-C4 |
2019-12-19 |
Tip Seals changed. |
|
|
Rahim Abasalti |
Maintenance for TPS-C4 |
2019-12-18 |
All in one gauge cleaned. |
|
|
Deepak Vyas |
Maintenance for TPS-C5 |
2019-12-18 |
All in one gauge cleaned. |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2019-12-18 |
All in one gauge cleaned. |
|
|
Deepak Vyas |
Maintenance for TPS-C2 |
2019-12-18 |
All in one gauge cleaned. |
|
|
Deepak Vyas |
Maintenance for bNQR Cryo Oven |
2019-10-10 |
Upgraded Capacity to 523K and thermometery |
|
|
Rahim Abasalti |
Maintenance for BNMR-Oxford Cryostat |
2019-10-07 |
High-T Upgrade Finished |
, , , , , , , , |
|
Derek Fujimoto |
Maintenance for bNQR Cryo Oven |
2019-10-02 |
Pre-beam bake and RGA |
, , , , , , |
|
Derek Fujimoto |
Maintenance for BNMR-Oxford Cryostat |
2019-09-19 |
High-T Upgrade Started |
, , , |
|
Derek Fujimoto |
Maintenance for DRP-10 |
2019-07-29 |
Contoller box exchanged. |
|
|
Deepak Vyas |
Maintenance for DRP46 |
2019-06-19 |
Motor swap |
|
|
Deepak Vyas |
Maintenance for DRP-03 |
2019-06-19 |
Motor swap |
|
|
Deepak Vyas |
Maintenance for DRP46 |
2019-06-18 |
Tip Seals changed. |
|
|
Deepak Vyas |
Maintenance for CMP-08 |
2019-06-14 |
Helium gas exchanged. |
|
|
Deepak Vyas |
Maintenance for CMP-06 |
2019-06-14 |
Helium gas exchanged. |
|
|
Deepak Vyas |
Maintenance for CMP-07 |
2019-06-14 |
Helium gas exchanged. |
|
|
Deepak Vyas |
Maintenance for CMP-11 |
2019-06-14 |
BNMR:CP5 : Adsorber changed. |
|
|
Deepak Vyas |
Maintenance for CMP-11 |
2019-06-13 |
BNMR:CP5 : Adsorber changed. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2019-06-12 |
Helium gas leak from dilution unit into IVC |
, |
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2019-06-12 |
VSU DR top loading siphon modified to use with Pandora |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2019-06-11 |
Valved Liquid Helium Transfer-line being Repaired. |
|
|
Deepak Vyas |
Maintenance for Helios |
2019-06-07 |
Transfer line leaks |
, , |
|
Deepak Vyas |
Maintenance for CRP-01 |
2019-04-26 |
Cold head changed. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2019-04-25 |
Large MuSR copper background |
|
|
Bassam Hitti |
Maintenance for M15 |
2019-04-20 |
Sep1 POS SF6 Leaking |
|
|
Bassam Hitti |
Maintenance for M20D |
2019-04-16 |
O-ring on slits leaking |
, , , , |
|
Deepak Vyas |
Maintenance for OLP-04 |
2019-04-09 |
Oil changed. |
|
|
Deepak Vyas |
Maintenance for OLP-09 |
2019-04-02 |
Oil Changed. |
|
|
Deepak Vyas |
Maintenance for OLP-06 |
2019-04-02 |
Oil Changed. |
|
|
Deepak Vyas |
Maintenance for OLP-03 |
2019-04-01 |
Oil changed and installed on DR |
|
|
Deepak Vyas |
Maintenance for OLP-21 |
2019-04-01 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for DRP-22 |
2019-03-26 |
Pump installed under septum in M20 |
|
|
Rahim Abasalti |
Maintenance for DRP-34 |
2019-03-26 |
Pump removed from Service. |
|
|
Rahim Abasalti |
Maintenance for CMP-01 |
2019-03-01 |
Adsorber changed. |
|
|
Deepak Vyas |
Maintenance for Gas Flow Cryostat (Miss Piggy) |
2019-02-06 |
Fix of the helium leak into the cryostat vacuum at base temperature. |
, , |
|
Bassam Hitti |
Maintenance for OLP-04 |
2019-01-30 |
Oil changed. |
|
|
Deepak Vyas |
Maintenance for OLP-18 |
2019-01-14 |
Oil Change |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2019-01-14 |
General Maintenance |
|
|
Rahim Abasalti |
Maintenance for DRP-17 |
2018-12-12 |
Pump found dead and marked dead. 7007 hrs |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2018-11-26 |
Replacement Faulty Board |
|
|
Rahim Abasalti |
Maintenance for Gas Flow Cryostat (Miss Piggy) |
2018-10-11 |
Helium leak into the cryostat vacuum at base temperature. |
|
|
Bassam Hitti |
Maintenance for CRP-09 |
2018-09-18 |
Rebuild and Reinstall |
|
|
Deepak Vyas |
Maintenance for ISAC-I BNQR |
2018-07-05 |
installation Seal-Kit for Load Lock 2" Gate Valve |
, , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2018-06-05 |
Replacing Threaded Copper piece on Sample Siphon |
, , |
|
Rahim Abasalti |
Maintenance for DRP-43 |
2018-04-13 |
Hour Meter,Electrical Box, Pump Fluid |
|
|
Rahim Abasalti |
Maintenance for CMP13 |
2018-04-13 |
Installation |
|
|
Deepak Vyas |
Maintenance for DRP-42 |
2018-04-12 |
Hour Meter,Electrical Box, Pump Fluid |
|
|
Rahim Abasalti |
Maintenance for DRP-04 |
2018-04-04 |
Full Rebuild |
|
|
Deepak Vyas |
Maintenance for M15 |
2018-03-21 |
Replace leaky O-ring seals for the valve (VA1) and window (AW1) between the M15 experimental area and Separator 2. |
|
|
Bassam Hitti |
Maintenance for M15 |
2018-03-21 |
Summary of Steve Dunbar's work between 2005 and 2014. |
|
|
Bassam Hitti |
Maintenance for DRP-17 |
2018-01-26 |
Pump Run to maintain it's operation. |
|
|
Deepak Vyas |
Maintenance for BNQR Cryostat |
2017-11-24 |
Thermometers not working |
|
|
Rahim Abasalti |
Maintenance for DRP-04 |
2017-10-23 |
Motor swap! |
|
|
Deepak Vyas |
Maintenance for DRP-23 |
2017-10-23 |
Motor swap! |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2017-10-18 |
Tip Seal replacement (premature) 1661 HRS |
|
|
Deepak Vyas |
Maintenance for DRP-08 |
2017-10-18 |
STANDARD OVERHAUL |
|
|
Rahim Abasalti |
Maintenance for DRP-34 |
2017-10-17 |
Tip seal replacement. |
|
|
Deepak Vyas |
Maintenance for DRP-34 |
2017-10-16 |
Tip Seals Changed |
|
|
Deepak Vyas |
Maintenance for DRP-02 |
2017-10-08 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for DRP-05 |
2017-10-08 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for DRP-02 |
2017-09-29 |
Tip Seals Changed |
|
|
Deepak Vyas |
Maintenance for DRP-04 |
2017-09-18 |
Tip Seal replacement |
|
|
Deepak Vyas |
Maintenance for DRP-39 |
2017-09-15 |
Major Rebuild |
|
|
Deepak Vyas |
Maintenance for CMP-11 |
2017-07-07 |
Installation Description |
|
|
Deepak Vyas |
Maintenance for CMP-04 |
2017-06-23 |
Compressor removed from service at BNMR cage location (ILE2A3CP5) |
|
|
Deepak Vyas |
Maintenance for SF6 Aciditor |
2017-04-03 |
SO2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for CPC-10 |
2017-03-29 |
Compressor unit failed. 10449hrs |
|
|
Deepak Vyas |
Maintenance for CMP-05 |
2017-03-29 |
Adsorber update. |
|
|
Deepak Vyas |
Maintenance for CRP-01 |
2017-03-29 |
Aluminum Tape failed and was changed. |
|
|
Deepak Vyas |
Maintenance for CRP-02 |
2017-03-29 |
Helium Charged. |
|
|
Deepak Vyas |
Maintenance for CMP-01 |
2017-03-29 |
Adsorber update. |
|
|
Deepak Vyas |
Maintenance for DRP-07 |
2017-03-17 |
STANDARD OVERHAUL |
|
|
Rahim Abasalti |
Maintenance for DRP-17 |
2017-03-16 |
STANDARD OVERHAUL |
|
|
Rahim Abasalti |
Maintenance for DRP-15 |
2017-03-16 |
STANDARD OVERHAUL |
|
|
Rahim Abasalti |
Maintenance for SF6 Gas Reclaimer |
2017-02-09 |
System Filters changed, compressors tested and System evacuated. |
|
|
Deepak Vyas |
Maintenance for DRP-04 |
2016-11-29 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for DRP-03 |
2016-11-29 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for TPS-C1 |
2016-10-06 |
Tip Seals changed and hours reset 5124 hours on original Tip Seals. |
|
|
Deepak Vyas |
Maintenance for TPS-C2 |
2016-10-04 |
Tip Seals changed and hours reset 7803 hours on original Tip Seals. |
|
|
Deepak Vyas |
Maintenance for TPS-C3 |
2016-10-03 |
Tip Seals changed and hours reset 4407 hours on original Tip Seals. |
|
|
Deepak Vyas |
Maintenance for TPS-C5 |
2016-09-29 |
Tip Seal hours reset. |
|
|
Deepak Vyas |
Maintenance for TPS-C5 |
2016-09-28 |
Tip Seal Replacement. |
|
|
Deepak Vyas |
Maintenance for SF6 Gas Reclaimer |
2016-09-15 |
Vacuum pump oil change |
|
|
Deepak Vyas |
Maintenance for OLP-04 |
2016-09-02 |
Oil Changed. |
|
|
Deepak Vyas |
Maintenance for M15 |
2016-08-25 |
M15 Separator 1 Negative Feed Through Removal and Replacement |
|
|
Darren Blom |
Maintenance for DRP-23 |
2016-05-31 |
Major Rebuild |
|
|
Deepak Vyas |
Maintenance for OLP-18 |
2016-04-25 |
Added Two Gate Valves, Hour-meter, And Thermometer Sticker |
|
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 2 |
2016-04-05 |
Shielding of the applied magnetic field at low temperature. |
|
Attachment | Size |
Fix | 387.42 KB |
|
Bassam Hitti |
Maintenance for OLP-10 |
2016-03-10 |
Pump Tested OK |
|
|
Deepak Vyas |
Maintenance for BNMR-Oxford Cryostat |
2016-02-23 |
Bellows drive bearings changed. |
|
|
Deepak Vyas |
Maintenance for BNMR-Oxford Cryostat |
2016-02-10 |
Bearings removed on horizontal linear cryostat translator. |
|
|
Deepak Vyas |
Maintenance for BNQR Cryostat |
2016-01-26 |
Repair Helium Leak in Heat Exchanger |
, , , , , , , , , |
|
Rahim Abasalti |
Maintenance for OLP-18 |
2015-11-24 |
Repair on Pump |
, , , , , , , , , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2015-11-24 |
Exchangeing He3 rotary Vane Pump and Coalescing Filter |
|
|
Rahim Abasalti |
Maintenance for CMP-03 |
2015-09-29 |
Rebuilt cryopump installed and adsorber changed.. |
|
|
Deepak Vyas |
Maintenance for BNMR-Oxford Cryostat |
2015-09-28 |
Installation of back Scatter plate |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2015-09-24 |
Maintenance on Top Loading Siphon |
, |
|
Rahim Abasalti |
Maintenance for DRP-23 |
2015-09-20 |
Sounded Horrible |
|
|
Deepak Vyas |
Maintenance for ISAC-1 BNMR |
2015-07-14 |
Cleaning the 10-inch Ceramic Break |
, , , , , , , , , |
|
Rahim Abasalti, Gerald Morris |
Maintenance for BNMR-Oxford Cryostat |
2015-04-29 |
Unmouting Back-Scatter Plate |
|
|
Rahim Abasalti |
Maintenance for M15 |
2015-04-25 |
Replace old quadrupole magnets power supplies |
|
|
Bassam Hitti |
Maintenance for BNMR-Oxford Cryostat |
2015-04-02 |
Back-Scatter Plate Added |
, , , |
|
Rahim Abasalti |
Maintenance for CMP-05 |
2015-03-26 |
Pressure adjusted BNMR-CP4 |
|
|
Deepak Vyas |
Maintenance for CMP-04 |
2015-03-26 |
Pressure adjusted BNMR-CP5 |
|
|
Deepak Vyas |
Maintenance for CMP-08 |
2015-03-25 |
Adsorber changed ILE2A1-CP3 |
|
|
Deepak Vyas |
Maintenance for CMP-07 |
2015-03-24 |
Pressure adjusted BNMR-CP3 |
|
|
Deepak Vyas |
Maintenance for CMP-06 |
2015-03-24 |
Adsorber changed ILE2A3-CP2 |
|
|
Deepak Vyas |
Maintenance for M15 |
2015-03-06 |
M15 Separator 1 Negative Feed Through Removal and Replacement |
|
|
Darren Blom |
Maintenance for OLP-09 |
2015-02-20 |
Pump Rebuilt |
|
|
Deepak Vyas |
Maintenance for OLP-05 |
2015-02-10 |
Pump Rebuilt |
|
|
Deepak Vyas |
Maintenance for ThermoHaake |
2014-10-27 |
Hose rewelded and redressed |
|
|
Deepak Vyas |
Maintenance for OLP-01 |
2014-10-15 |
Pump Temporarily Decommisioned |
|
|
Deepak Vyas |
Maintenance for OLP-02 |
2014-10-15 |
Pump Temporarily Decommisioned |
|
|
Deepak Vyas |
Maintenance for OLP-07 |
2014-10-15 |
Pump Temporarily Decommisioned |
|
|
Deepak Vyas |
Maintenance for OLP-06 |
2014-05-01 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-08 |
2014-05-01 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for CP-05 |
2014-04-30 |
Pump serviced |
|
|
Deepak Vyas |
Maintenance for DRP-02 |
2014-03-06 |
Pump serviced |
|
|
Deepak Vyas |
Maintenance for CP-11 |
2014-02-13 |
C-clip failed and subsequent operation caused failure. |
|
|
Deepak Vyas |
Maintenance for CP-11 |
2014-02-13 |
Pump rebuilt. |
|
|
Deepak Vyas |
Maintenance for CRP-02 |
2014-02-13 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for CP-01 |
2013-06-06 |
Removed from service from M20 Separator 1 |
|
|
Deepak Vyas |
Maintenance for OLP-01 |
2013-05-17 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-03 |
2013-05-17 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-06 |
2013-05-17 |
Oil changed and flushed |
|
|
Deepak Vyas |
Maintenance for CPC-09 |
2013-05-15 |
Adsorber changed @ 10264HRS |
|
|
Deepak Vyas |
Maintenance for TRP-06 |
2013-05-13 |
Not working. Sent out for rebuilding. |
|
|
Gerald Morris |
Maintenance for DRP-06 |
2013-05-09 |
Tip seals replaced. |
|
|
Deepak Vyas |
Maintenance for CRP-01 |
2013-04-30 |
Full rebuild |
|
|
Deepak Vyas |
Maintenance for TRP-04 |
2013-04-12 |
Fan Changed |
|
|
Gerald Morris |
Maintenance for TRP-05 |
2013-04-12 |
Fan Changed |
|
|
Gerald Morris |
Maintenance for TRP-08 |
2013-03-28 |
Installation |
|
|
Gerald Morris |
Maintenance for TRP-08 |
2013-03-28 |
Cooling fan changed. |
|
|
Gerald Morris |
Maintenance for Helios |
2013-03-06 |
Liquid Nitrogen Auto Fill System |
|
|
Bassam Hitti |
Maintenance for DR |
2013-03-05 |
Replace top flange O-ring |
, , |
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2013-02-22 |
Top Large Flange O-ring Replacement |
, , , , , , , , , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2013-01-15 |
DR check after warm up |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2012-09-28 |
increase in L-He consumption/ condensation on vacuum jacket |
|
|
Bassam Hitti |
Maintenance for BNMR-Oxford Cryostat |
2012-09-14 |
Gold Plated Cryostat Cap |
, , , , |
|
Rahim Abasalti |
Maintenance for BNMR-Oxford |
2012-09-14 |
Gold Plating the Copper Disk |
, |
|
Rahim Abasalti |
Maintenance for M9B |
2012-09-12 |
Patching Up Solenoid Gas Cooled Lead Flanges Leak |
, , , , , , |
|
Rahim Abasalti |
Maintenance for M15 |
2012-07-31 |
spin rotators HV+ suppplies recover poorly after being shut down for several hours |
|
|
Syd Kreitzman |
Maintenance for OLP-04 |
2012-07-16 |
Oil change |
|
|
Deepak Vyas |
Maintenance for OLP-20 |
2012-07-16 |
Oil change |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2012-07-10 |
Leak from dilution unit to IVC |
|
|
Bassam Hitti |
Maintenance for M9B |
2012-03-30 |
Beam Height adjustment |
|
|
Rahim Abasalti |
Maintenance for OLP-11 |
2012-02-08 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2011-10-03 |
Aire Minature Pressure Switch |
|
|
Rahim Abasalti |
Maintenance for ThermoHaake |
2011-04-26 |
Replacement unit |
|
|
Donald Arsenau |
Maintenance for Circulator |
2011-04-26 |
Replacement Unit |
|
|
Donald Arsenau |
Maintenance for BNMR-Oxford Cryostat |
2010-05-19 |
Leak Repair |
|
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 1 |
2010-04-19 |
Weak magnetism at low temperature |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2009-12-12 |
XGS-600 Gauge Controller Replacement |
|
|
Rahim Abasalti |
Maintenance for HGFC-Oxford |
2009-10-31 |
Repair Leak in Vacuum and Helium Space |
|
|
Rahim Abasalti, Bassam Hitti |
Maintenance for OLP-08 |
2009-10-16 |
Case Gasket |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2009-08-24 |
QSB Valve Repair |
|
|
Rahim Abasalti |
Maintenance for High-Time |
2009-07-14 |
X-Y Table Bellows Replacement |
|
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 1 |
2009-05-08 |
Kapton Window Replacement |
|
|
Rahim Abasalti |
Maintenance for M9B |
2009-03-30 |
Beam Height adjustment |
|
|
Rahim Abasalti |
Maintenance for High-Time |
2009-03-26 |
Field Decay |
|
|
Bassam Hitti |
Maintenance for High-Time |
2009-03-24 |
Test Results |
|
|
Bassam Hitti |
Maintenance for High-Time |
2009-03-23 |
American Magnetic report |
|
|
Bassam Hitti |
Maintenance for High-Time |
2009-03-23 |
Magnet Failure in 2008 |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2009-02-18 |
Fixing Broken LN2 Shield Kel-F Spacer and Installing New Ones |
, , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2009-01-22 |
Reinstallation Booster Pump |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2008-11-24 |
Magnet Spacer(Kel-F) Replacement |
|
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 1 |
2008-11-24 |
Kapton Window Change |
|
|
Rahim Abasalti |
Maintenance for OLP-18 |
2008-11-12 |
Oil changed After Major Repair |
|
|
Rahim Abasalti |
Maintenance for Helios |
2008-11-01 |
Quench!! |
|
|
Rahim Abasalti |
Maintenance for ThermoHaake |
2008-10-31 |
Control lock-up |
|
|
Donald Arsenau |
Maintenance for Circulator |
2008-10-31 |
Control Lock-up |
|
|
Donald Arsenau |
Maintenance for DR(Pandora) |
2008-10-06 |
Gas Analyzer- O2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for Belle |
2008-08-13 |
Leak Check |
|
|
Rahim Abasalti |
Maintenance for OLP-18 |
2008-06-13 |
Major Repair |
, |
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 1 |
2008-02-26 |
Origin of Large Anomalous Knight Shift at Low Temperature |
|
|
Rahim Abasalti, Bassam Hitti |
Maintenance for BNQR Cryostat |
2008-02-19 |
Modification on Al Heat Shield Flange |
|
|
Rahim Abasalti |
Maintenance for OLP-06 |
2008-02-14 |
Varian Pump DS302 Put in place of damaged alcatel 2012. |
|
|
Deepak Vyas |
Maintenance for OLP-08 |
2008-02-12 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-20 |
2008-02-11 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-10 |
2008-02-11 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-03 |
2008-02-10 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-04 |
2008-02-04 |
Oil changed |
|
|
Deepak Vyas |
Maintenance for OLP-01 |
2008-01-15 |
Pump Service |
|
|
Deepak Vyas |
Maintenance for Belle |
2007-11-22 |
Removing Magnet and Some Notes |
|
|
Rahim Abasalti |
Maintenance for Horizontal Gas Flow Cryostat 2 |
2007-09-27 |
Repair and Diode Replacement |
|
|
Rahim Abasalti, Bassam Hitti |
Maintenance for DR(Pandora) |
2007-09-05 |
Side Pocket Replacement |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2007-06-04 |
Heat Exchanger Repair |
|
|
Rahim Abasalti |
Maintenance for Helios |
2007-02-07 |
Modifying N2 Sensor |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2007-02-07 |
Gas Analyzer- O2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for Varian979 |
2007-01-23 |
maintaining spectrometer tube assembly |
, , , , , , |
|
Rahim Abasalti |
Maintenance for OLP-04 |
2007-01-23 |
Oil changed and LD serviced |
|
|
Rahim Abasalti |
Maintenance for Helios |
2007-01-22 |
Fixing Vacuum Jacket Indium Seal Leak |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2007-01-17 |
Cleaning Gauges, Valves, and Gas Handeling Lines |
|
|
Rahim Abasalti |
Maintenance for Helios |
2006-09-11 |
Cold Cathode Gauge Maintenance |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2006-08-10 |
Flow Through Test and Leak Check |
|
|
Rahim Abasalti |
Maintenance for OLP-20 |
2006-08-09 |
Oil changed |
|
|
Rahim Abasalti |
Maintenance for OLP-10 |
2006-08-09 |
Oil changed |
|
|
Rahim Abasalti |
Maintenance for OLP-18 |
2006-04-26 |
Oil Changed |
|
|
Rahim Abasalti |
Maintenance for Helios |
2006-04-19 |
|
|
|
|
Maintenance for BNMR-Oxford Cryostat |
2005-08-09 |
Kapton Heater |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-05-18 |
Temp Results After Taping Magnet |
|
|
Rahim Abasalti |
Maintenance for OLP-04 |
2005-04-27 |
Oil changed |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-04-26 |
Cooling to He |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-04-25 |
Temp @ N2 |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-02-23 |
Temp Results at LN2 |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-02-22 |
Leak Rate While Cooling Down |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-02-08 |
Modification Top Flange of He Bath |
|
|
Rahim Abasalti |
Maintenance for Helios |
2005-01-07 |
Temp Test at SS Neck |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-11-22 |
Flow Through Test and Leak Checking IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-10-19 |
Leak Rate While Cooling Down |
|
|
Rahim Abasalti |
Maintenance for Varian979 |
2004-09-29 |
Oil change |
|
|
Edi Dalla Valle |
Maintenance for OLP-04 |
2004-09-29 |
Oil changed |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-09-28 |
Flow Test and Leak Checking iVC?OVC |
|
|
Rahim Abasalti |
Maintenance for Helios |
2004-09-12 |
Leak Rate and Temp While Cooling Down |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-08-10 |
Flow Through Test and Leak Checking IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for Helios |
2004-08-04 |
Leak Rate @ He Temperature |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-05-19 |
Installing Gauges for IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for BNMR-Oxford Cryostat |
2004-05-05 |
Burnt Heaters |
|
|
Rahim Abasalti |
Maintenance for Helios |
2004-04-19 |
Leak Rate |
|
|
Rahim Abasalti |
Maintenance for BNMR-Oxford Cryostat |
2003-05-22 |
Diode and RF Leads |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2003-04-28 |
Filter and Gauge cleaning |
|
|
Rahim Abasalti |
Maintenance for BNMR-Oxford Cryostat |
2002-04-20 |
Diode Replacement and Wiring Maintenance |
|
|
Rahim Abasalti |
Maintenance for BNMR-Oxford Cryostat |
2002-03-01 |
Diode Replacement |
|
|
Rahim Abasalti |