User login

Maintenance for Helios

Date: 
Monday, April 19, 2004
Synopsis: 
Leak Rate
Equipment/Beam Line: 
Description: 

pressure 5E-4 torr BG 1.6E-8 (leak detector directly attached, no turbo)

Author: 
Rahim Abasalti