User login

Maintenance for CRP-11

Date: 
Tuesday, October 12, 2021
Synopsis: 
Rebuilt cold head, New arrays.
Equipment/Beam Line: 
Description: 

This pump used in this location since the previous pump (CRP06) had a faulty Si diode.  This cold head had a rebuild and the guts of the vacuum vessel were changed. 

Author: 
Deepak Vyas