User login

Maintenance for Horizontal Gas Flow Cryostat 1

Date: 
Friday, May 8, 2009
Synopsis: 
Kapton Window Replacement
Equipment/Beam Line: 
Description: 

Cryostat was leaking through the kapton window. New window was installed and inside the sample area was cleaned from left over broken pieces of samples. Leak check around the window and Indium seal was around 5E-9 torr.

Author: 
Rahim Abasalti