User login

Maintenance for DRP-17

Date: 
Friday, January 26, 2018
Synopsis: 
Pump Run to maintain it's operation.
Equipment/Beam Line: 
Description: 

Pump run with the ballast open for 30 minutes followed by with the ballast closed for 30 minutes.

Author: 
Deepak Vyas