User login

Maintenance for TPS-C1

Date: 
Wednesday, December 18, 2019
Synopsis: 
All in one gauge cleaned.
Equipment/Beam Line: 
Description: 

All-in-one gauge cleaned with scotch-brite, acetone and ethanol in that order.  Gauge reinstalled the pump was run open to air for two minutes and pump tested and registered 10E-5 torr range. Pump deemed operational and expected to be used in the up-coming beam season. 
 

Author: 
Deepak Vyas