Maintenance for ISAC-1 BNMR

Date: 
Friday, February 17, 2023
Synopsis: 
beta-NMR isolation transformer leaky input feedthrough is repaired
Equipment/Beam Line: 
Description: 

Contractor (Beaver Electrical) has repaired the leaky feedthrough.  PO TR-2023-00083.  Report prepared by the contractor is attached. Despite having time to prepare, the Contractor did not source replacement parts.

Author: 
Gerald Morris