User login

Maintenance for CMP-07

Date: 
Friday, June 14, 2019
Synopsis: 
Helium gas exchanged.
Equipment/Beam Line: 
Description: 

Helium gas charged and vented and over again to a total of 20 times.  5.0 grade Helium used.  Final pressure set to 205PSIG.  Starting pressure was 0 PSIG.  A large leak is suspected.  Will snoop and find leak. 

Author: 
Deepak Vyas