User login

Maintenance for BNMR-Oxford Cryostat

Date: 
Wednesday, May 19, 2010
Synopsis: 
Leak Repair
Equipment/Beam Line: 
Description: 

The cryostat was diagnosed with helium leak from phase separator to the UHV space of the cryostat (Figure 1). The leak rate was about 10-7 torr.lit/sec at 10-9 torr in room temprateure.

Author: 
Rahim Abasalti