User login

Maintenance for DR(Pandora)

Date: 
Wednesday, May 19, 2004
Synopsis: 
Installing Gauges for IVC/OVC
Equipment/Beam Line: 
Description: 

New Convectorr and Cold Cathode gauges were installed for IVC and OVC. One convectorr gauge for each line and a cold cathode gauge only for IVC.

Author: 
Rahim Abasalti