User login

Maintenance for DR(Pandora)

Date: 
Thursday, August 10, 2006
Synopsis: 
Flow Through Test and Leak Check
Equipment/Beam Line: 
Description: 

leak check OK on both gas handling system and IVC/OVC. flow through test is OK.

Author: 
Rahim Abasalti