User login

Maintenance for M20 Upstream

Date: 
Monday, March 6, 2023
Synopsis: 
M20 turbo pumps.
Equipment/Beam Line: 
Description: 

Turbo pumps M20:TP1, M20:TP8, M20:SM1:TP1 run.

Currents: TP1  0.97A initially ; 0.53A 3 h later

                  TP8   1.3A initially; 0.70A 3 h later

                  SM1:TP1   0.75A initially; 0.76 3 h later.

 

TP3 was also powered-on for several days prior to now.

 

Author: 
Gerald Morris