User login

Maintenance History

Equipment Date(y-m-d)sort ascending
Synopsis
Image Attachment Document Author
Maintenance for M9A 2024-10-09 Hole #2 in the Ceramic of Sep#2+ Bassam Hitti
Maintenance for M9A 2024-01-08 Replacement of Arc Flashed damaged Ceramic on S2+ and Added Aluminium Corona Shield Rahim Abasalti
Maintenance for M9A 2023-06-06 SO2 Purity in Separators SF6 Volumes Rahim Abasalti
Maintenance for M9A 2023-03-29 Separator 1- Ion Gauge Addition Rahim Abasalti
Maintenance for M9A 2023-03-23 Separator 2- Addition & Replacement Ion Gauges , Rahim Abasalti
Maintenance for M9A 2020-10-26 Replacing pressure switch for S2, Negative on Stack Volume Rahim Abasalti