User login

Maintenance for DRP-50

Date: 
Wednesday, April 27, 2022
Synopsis: 
Tip seals changed.
Equipment/Beam Line: 
Description: 

During tear-apart inspection, the anodized surface was found to have a  moderate amount of circular scratches.  Scrolls were cleaned and new tip seals were installed.  Pump installed in BNQR in the location ILE2A1:BP1.  The base pressure on the convectron gauges where it is in operation showed 20mTorr.  Pump was not too hot.  around 50c.

Author: 
Deepak Vyas