Equipment |
Date(y-m-d)![]() |
Synopsis |
Image | Attachment Document | Author | ||||
---|---|---|---|---|---|---|---|---|---|
Maintenance for ISAC-1 BNMR | 2023-02-24 | All scroll pumps tested to determine base pressure, state of wear. |
![]() ![]() |
Gerald Morris | |||||
Maintenance for ISAC-1 BNMR | 2023-02-17 | beta-NMR isolation transformer leaky input feedthrough is repaired |
|
Gerald Morris | |||||
Maintenance for ISAC-1 BNMR | 2015-07-14 | Cleaning the 10-inch Ceramic Break |
|
Rahim Abasalti, Gerald Morris |