User login

Maintenance for TPS-C4

Date: 
Wednesday, December 18, 2019
Synopsis: 
All in one gauge cleaned.
Equipment/Beam Line: 
Description: 

Gage was cleaned with scotch-brite and acetone and followed by ethanol.  There was a hard deposit in the gauge that could not be resolved.  Gauge reinstalled, pump was run open to air for 2 minutes and pump only registered single torr range when isolated.  Scroll pump will be serviced next. 

 

 

Author: 
Deepak Vyas