User login

Maintenance for DR(Pandora)

Date: 
Wednesday, June 12, 2019
Synopsis: 
VSU DR top loading siphon modified to use with Pandora
Equipment/Beam Line: 
Description: 

While waiting to fix the helium leak to the vacuum space of the original sample loading siphon we modified and tested the VSU siphon

Author: 
Bassam Hitti