User login

Maintenance for DR(Pandora)

Date: 
Monday, November 22, 2004
Synopsis: 
Flow Through Test and Leak Checking IVC/OVC
Equipment/Beam Line: 
Description: 

IVC &OVC leak check OK. BG: 1E-7 (before zeroing) 1E-9 (after zeroing) Flow through test OK in handeling system. BG in IVC/OVC 2E-6 (before zeroing) 1E-9 (after zeroing)

Author: 
Rahim Abasalti