User login

Maintenance for DR(Pandora)

Date: 
Tuesday, August 10, 2004
Synopsis: 
Flow Through Test and Leak Checking IVC/OVC
Equipment/Beam Line: 
Description: 

Leak check OK for IVC &OVC. Background 1E-7 (before zeroing) 1E-9 (after zeroing). Flow test OK with 500mb He4 in gas handeling system. BG in IVC/OVC 2E-6 (before zeroing) 1E-9 (after zeroing)

Author: 
Rahim Abasalti