Equipment | Date(y-m-d) |
Synopsis |
Image | Attachment Document | Author | ||||
---|---|---|---|---|---|---|---|---|---|
Maintenance for ISAC-I BNQR | 2022-09-23 | TP ILE2A1:TP1 failed & replaced |
|
Gerald Morris | |||||
Maintenance for ISAC-I BNQR | 2018-07-05 | installation Seal-Kit for Load Lock 2" Gate Valve | , , |
|
Rahim Abasalti |