User login

Maintenance History

Equipment Date(y-m-d)sort descending
Synopsis
Image Attachment Document Author
Maintenance for M15 2012-07-31 spin rotators HV+ suppplies recover poorly after being shut down for several hours Syd Kreitzman
Maintenance for M15 2015-03-06 M15 Separator 1 Negative Feed Through Removal and Replacement Darren Blom
Maintenance for M15 2015-04-25 Replace old quadrupole magnets power supplies
  1. AttachmentSize
    PDF icon Quad Power Supplies92.9 KB
Bassam Hitti
Maintenance for M15 2016-08-25 M15 Separator 1 Negative Feed Through Removal and Replacement Darren Blom
Maintenance for M15 2018-03-21 Replace leaky O-ring seals for the valve (VA1) and window (AW1) between the M15 experimental area and Separator 2. Bassam Hitti
Maintenance for M15 2018-03-21 Summary of Steve Dunbar's work between 2005 and 2014. Bassam Hitti
Maintenance for M15 2019-04-20 Sep1 POS SF6 Leaking Bassam Hitti
Maintenance for M15 2021-03-05 Fix the Argon flow Piezo-electric valve (Separator 1). Bassam Hitti
Maintenance for M15 2021-03-29 All three window valves membranes changed. Deepak Vyas
Maintenance for M15 2021-04-14 S2DP1 Separator diff pump heater checked. Deepak Vyas
Maintenance for M15 2021-04-20 S1DP1 Separator diffusion pumps heater refreshed. Deepak Vyas
Maintenance for M15 2021-10-19 Replaced Sep. 2 Ion Gauge Wiring Config for Ion Gauge, Replacement  Ion Gauge Darren Blom
Maintenance for M15 2021-11-09 Replace Bad O-Ring on Separator 1 Upstream Window Valve Pinched O-Ring ID 7.984 X 0.139 W Darren Blom
Maintenance for M15 2023-03-10 Separator 1 Positive and Negative Feedthrough Replacement Darren Blom
Maintenance for M15 2023-11-14 Replacement S1DP1 Separator diffusion pumps heater . , , , , Rahim Abasalti