Maintenance for DR(Pandora) |
2012-07-10 |
Leak from dilution unit to IVC |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2012-09-28 |
increase in L-He consumption/ condensation on vacuum jacket |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2013-01-15 |
DR check after warm up |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2018-06-05 |
Replacing Threaded Copper piece on Sample Siphon |
, , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2019-01-14 |
General Maintenance |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2019-04-25 |
Large MuSR copper background |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2019-06-11 |
Valved Liquid Helium Transfer-line being Repaired. |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2019-06-12 |
Helium gas leak from dilution unit into IVC |
, |
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2019-06-12 |
VSU DR top loading siphon modified to use with Pandora |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2022-02-18 |
Adjust the mixture pressure and He3/He4 ratio |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2022-01-21 |
Replacement and Maintenance of 1Kpot and Diff Pump Valves |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-01-17 |
Installation: New SS Tubing for GHS, Minature Gate valve |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-01-19 |
Installation of Automated Flow Controller valve |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2022-03-03 |
Leak in GHS |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2003-04-28 |
Filter and Gauge cleaning |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-05-19 |
Installing Gauges for IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-08-10 |
Flow Through Test and Leak Checking IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-09-28 |
Flow Test and Leak Checking iVC?OVC |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-10-19 |
Leak Rate While Cooling Down |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2004-11-22 |
Flow Through Test and Leak Checking IVC/OVC |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2006-08-10 |
Flow Through Test and Leak Check |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2007-01-17 |
Cleaning Gauges, Valves, and Gas Handeling Lines |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2007-02-07 |
Gas Analyzer- O2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2023-02-17 |
Leak into OVC, short internal z-coil and leaky Auto V12 |
, , , , , , , |
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2007-06-04 |
Heat Exchanger Repair |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2007-09-05 |
Side Pocket Replacement |
|
|
Deepak Vyas |
Maintenance for DR(Pandora) |
2008-10-06 |
Gas Analyzer- O2 Sensor Replacement |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2008-11-24 |
Magnet Spacer(Kel-F) Replacement |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2009-01-22 |
Reinstallation Booster Pump |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2009-02-18 |
Fixing Broken LN2 Shield Kel-F Spacer and Installing New Ones |
, , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2009-08-24 |
QSB Valve Repair |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2009-12-12 |
XGS-600 Gauge Controller Replacement |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2015-09-24 |
Maintenance on Top Loading Siphon |
, |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2015-11-24 |
Exchangeing He3 rotary Vane Pump and Coalescing Filter |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2023-11-22 |
Penning gauge reading too high!-Clean oil for Diff Pump |
|
|
Bassam Hitti |
Maintenance for DR(Pandora) |
2011-10-03 |
Aire Minature Pressure Switch |
|
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2013-02-22 |
Top Large Flange O-ring Replacement |
, , , , , , , , , |
|
Rahim Abasalti |
Maintenance for DR(Pandora) |
2024-04-16 |
During shutdown high pressure reading on the condenser gauge |
|
|
Bassam Hitti |