User login

Maintenance for OLP-10

Date: 
Thursday, March 10, 2016
Synopsis: 
Pump Tested OK
Equipment/Beam Line: 
Description: 

Pump was previously removed from service and suspected to be unoperational.  Pump was tested and it worked.  Tested for 2 hours with the ballast being used for 10 minutes.  Pumped down to 5 mTorr.  Pump placed on the VSU DR platform. 

Author: 
Deepak Vyas