Maintenance for CRP-09

Date: 
Tuesday, September 18, 2018
Synopsis: 
Rebuild and Reinstall
Equipment/Beam Line: 
Description: 

Tim Stanford rebuilt the Helium-space components including cleaning the displacers.

Deepak Vyas changed the Vacuum-space components including the radiation sheild.

Pump installed into M20 S1 CP1 location and run.  Shown to stabilize at 9.5K.

Author: 
Deepak Vyas